Quick turn
Fuel, along with anything else you've requested, ready when you shut down. You're fuelled before your passengers finish their coffee.
Private aviation terminal at Nanaimo Airport (CYCD)
Your fuel, transportation and room are ready before you touch down, so your crew rests and your passengers step straight into their day.
Opening spring 2027. Inquire now about contracts starting May 1, 2027.
You've just flown the leg. Now you're waiting on a fuel truck, tracking down ground power, calling around for a crew car and hunting for a room, all while your duty clock keeps running. Every minute on the ramp is a minute you're not resting. And the one detail that slips is the one your principal remembers.
Waiting on the ramp for fuel
Your duty clock still running
A midnight search for a room
You're tired, your passengers are waiting, and the ground is where trips fall apart. That's why everything you need after landing comes from one desk at Pacific Gateway.
Send your tail number, ETA and what you need. It takes two minutes.
FlightBridge connectivity coming spring 2027
Fuel, car, catering and rooms, confirmed before you depart.
Shut down, step off, and let us take it from there.
We've been on the flightline side, and we know how frustrating it is to wait on other people. That's why we built Pacific Gateway around getting your aircraft turned and your crew on their way.
Flying into Nanaimo regularly? Contact us to discuss contract rates.
Contact us for more information.
Opening spring 2027. Tell us about your trip and we'll be in touch.
Thanks. We've received your request and will be in touch to confirm your arrival details.